New Data Collection Technology in Interior Environments and Processing Algorithms for BIM Integration.
New Data Collection Technology in Interior Environments and Processing Algorithms for BIM Integration.
Code: | RTC-2016-5257-7 |
Program: | RETOS Colaboración. Convocatoria 2016 |
FStart date: | July 2016 |
End date: | December 2018 |
El presente proyecto ha sido desarrollado con la colaboración económica del Fondo Europeo de Desarrollo Regional (FEDER), a través del programa “Retos Colaboración 2016” y el Ministerio de Economía y Competitividad.
The AUTO-BIM project is part of the setting-out and quality control activities for construction works.
The main objective of the AUTO-BIM project is the creation and validation of a new method for acquiring, processing and managing three-dimensional spatial data in interior spaces without GNSS coverage (global satellite navigation system). This data acquisition will be carried out electronically by an autonomous mobile robot and the data obtained will be integrated into standardised information models BIM (Building Information Modelling).
The desired result is a reduction in time, systematisation and overall improvement in setting-out and quality control of construction works, computerising the monitoring process of the evolution of the work and detecting deviations from what was planned. This leads to cost reduction, streamlined construction work and improved quality.