Tunnel works control with total station.

aplitop-spinning
Logo TcpTUNNEL

TcpTUNNEL

Control of tunnel works with total station

Tunnel works control with total station.

About the product

TcpTunnel can be installed in a wide range of motorized total stations, or in a data collector.

The cross sections are measured automatically, simply giving the desired interval and the number of points per profile. The application shows the theoretical and measured tunnel section, with top and front views displaying infra and over-excavation areas.

It also has functions for setting out the front, pavement or tunnel profiles, checking control points, calculating areas, etc.

Solutions by Industry

Explore how our applications are used in your sector or industry.

Quarries and Mining

We offer solutions to meet the needs of all types of quarry and mine operations, both open-pit and underground.

Quarries and Mining

BIM

Our software facilitates the exchange of survey and civil project data using industry OpenBIM standards such as IFC and BCF.

BIM

Related products

TcpScancyr
TcpScancyr

Analysis of tunnel data captured by terrestrial scanner

TcpTUNNEL CAD
TcpTUNNEL CAD

Analysis of tunnel data measured by total station

Can we help you?