17.22. Earthworks

          This command is used to carry out movements of materials between cut and fill, as well as account for the different dumps and stockpile sites available.
          All earthworks are shown in a list that displays the material moved, the distance transported and the estimated cost of transport.
          First the command requests the mass diagram file we will be working with, and then some on-screen coordinates to draw the rectangle graph on which different earthworks will be defined.
 
The following information is given in the list:
Mov: Identifies movement.
Origin: Accumulation of cut from which the terrain is to be moved. Also, in this case Stockpile can appear from which material is taken.
Destination: Accumulation of fill to which the material will be taken. It can also be a dump which is filled with the excess material.
Distance: Distance of transport.
Volume: Volume of the material moved.
Cost: Estimated cost in Euros of the earth movement, according to the costs table of the materials configured with the corresponding command.