Update yourself with the new version MDT8.5

With you we are better

Update yourself with the new MDT8.5
Specialists in Surveying and Civil Engineering

Our experience
is your best work tool

Release of the latest version

TcpGPS 2.0 for Android

New user interface and more features

News TcpGPS for Android
Reseller net

Wherever you are
you will find us

We have an extensive network of distributors all over the world

Find us

Our applications are used around the world

Cases Studies

Riyadh Metro - Line 3

The new Line 3 of Riyadh Metro is the longest section of the gigantic project of the new metro network of the capital city of the Kingdom of Saudi Arabia. Line 3 is composed of 22 stations (including the iconic Downtown Station and Western Station), 2 depots, and 6 park & ride.

Survey with drone and mobile terrestrial lidar

The project consists of topography and the design of 50 kilometres of track, using a drone survey and a mobile terrestrial lidar system.

Calculation of earthworks volumes

In Croatia, the State Geodetic Administration a few years ago changed the coordinate system which we used for many years (HDKS5(6)/GK) to a new (HTRS96/TM) coordinate system. So, we need to transform lots of cadastral maps and surveying drawings to a new coordinate system.

Transformation to a new coordinate system

In a camping site near Rovinij (Croatia), a great deal of work had to be taken, which almost 90% of the camping site changed completely. The problem was not the surveying of the new camping site for the surveying office that I work for, but the calculation of the volumes of earthworks for the contractor company.

Photovoltaic Plant Solara 4

The Solara 4 plant, located in the town of Vaqueiros (Alcoutim) in the Faro district (Portugal) is the largest facility in Europe of this type built without public aid. It is made up of 661,500 high-efficiency photovoltaic modules, with an installed power of 220 MWp and an estimated production of 380,000,000 kWh / year, enough to generate renewable energy to supply more than 100,000 homes.

Emergency work for road landslide

In Asturias, after a period of adverse weather conditions, a very unique emergency situation occurs that involves great difficulty, with the need to use very specific technical equipment and qualified personnel for execution, due to the potential existing high risk.

Assembly of solar modules

The project consisted of the assembly of solar modules for the photovoltaic plant in Billeberga, Sweden. 1,800 points were staked out to locate the double pilings or drives of the fixed metal structures. The difference between the front and rear pilings had to be 45º, so that the panels had the same inclination, and always oriented towards the south, in order to achieve the best light capture.

We can help you

If you have any specific questions about your needs, or if you already have it clear and want to buy the application, do not hesitate. Contact us and we will be happy to assist you.

Can we help you?