Saltar al contenido principal
Success storyEspelúy, Jaén, Spain

Construction of an Irrigation Pond in Jaén, Spain

A civil works company used Aplitop software to design and build two adjoining reservoirs totaling 180,000 m³ in Jaén.

Construction of an Irrigation Pond in Jaén, Spain

Project challenges

The project consisted of the construction of two adjoining reservoirs, located in the municipality of Espelúy (Jaén, Spain), with a combined regulation capacity of approximately 180,000 m3, which will be filled by pumping with a flow of more than 700 l/s.

The purpose of having two regulating elements instead of a single pond is to decant the silty materials from the pumping, which takes its water directly from the Guadalquivir River, in the first one.

Creating this pond for the Iraizoz Irrigation Community was a challenge for the company, due to the large volume, both in terms of water capacity and earthworks.

Construction of an irrigation pond in Jaén, Spain

Solutions

The following tasks were performed:

  • Stake out of the pond.
  • Adequacy of slopes to withstand water pressure.
  • Profiling of embankments and cuttings with perimeter paths.
  • Perimeter paths and ditches for water evacuation.
  • Reforestation of trees in the affected area.
Construction of an irrigation pond in Jaén, Spain en india

Benefits

  • Speed, convenience, and simplicity in design thanks to the TCP-MDT 9 program.
  • Easy to adapt to other formats and vice versa.
  • Easy to attach images with the TCPImage module.

Have a similar project?

Tell us about your project and we will help you find the ideal surveying solution.

Contact us